summaryrefslogtreecommitdiffstats
path: root/Documentation
diff options
context:
space:
mode:
authorLuca Abeni <luca.abeni@unitn.it>2015-05-18 15:00:26 +0200
committerIngo Molnar <mingo@kernel.org>2015-05-19 08:39:19 +0200
commit3aa2dbe27f76528660e18b21f88a2c78ea8996ba (patch)
tree27f1c1fdb764cd5a3b4dd59f4ceb4467562e92fc /Documentation
parent3a3a58d4068382cf2e05f5c8fd3a0587836dacec (diff)
downloadlinux-3aa2dbe27f76528660e18b21f88a2c78ea8996ba.tar.bz2
sched/dl/Documentation: Fix typos
Signed-off-by: Luca Abeni <luca.abeni@unitn.it> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: henrik@austad.us Cc: juri.lelli@gmail.com Cc: raistlin@linux.it Link: http://lkml.kernel.org/r/1431954032-16473-4-git-send-email-luca.abeni@unitn.it Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'Documentation')
-rw-r--r--Documentation/scheduler/sched-deadline.txt4
1 files changed, 2 insertions, 2 deletions
diff --git a/Documentation/scheduler/sched-deadline.txt b/Documentation/scheduler/sched-deadline.txt
index af40d6cc776b..0f51a1a2f4b9 100644
--- a/Documentation/scheduler/sched-deadline.txt
+++ b/Documentation/scheduler/sched-deadline.txt
@@ -52,7 +52,7 @@ CONTENTS
"admission control" strategy (see Section "4. Bandwidth management") is used
(clearly, if the system is overloaded this guarantee cannot be respected).
- Summing up, the CBS[2,3] algorithms assigns scheduling deadlines to tasks so
+ Summing up, the CBS[2,3] algorithm assigns scheduling deadlines to tasks so
that each task runs for at most its runtime every period, avoiding any
interference between different tasks (bandwidth isolation), while the EDF[1]
algorithm selects the task with the earliest scheduling deadline as the one
@@ -190,7 +190,7 @@ CONTENTS
- deadline = D
- period <= P
- IOW, if runtime >= WCET and if period is >= P, then the scheduling deadlines
+ IOW, if runtime >= WCET and if period is <= P, then the scheduling deadlines
and the absolute deadlines (d_j) coincide, so a proper admission control
allows to respect the jobs' absolute deadlines for this task (this is what is
called "hard schedulability property" and is an extension of Lemma 1 of [2]).